I'll be able to garage the truck for about 2 months or so here pretty quick, so I plan on getting the bed supported properly, sheetmetal the bed, bodywork/primer cab, re-plumb entire truck with new valves and 3/8" lines, add guages, and maaaaaaybe re-bag the front, time permitting. I'm lookin' forward to it!!