i just cut with a cut off wheel til the lights fit i don't think thats the right way to do it tho but it worked for me. im gonna switch the core support once the front end i z'ed
here is where the line is setup now after all was done i bled all 4 corners and took it for a test drive the brake pedal feels fore stiffer. it was such a pain to do this mod specially since i had never messed wit brake lines or flairing tools but it was all worth it in the end. it really cleans up the frame and give more room for the bag stuff
back half is done let me know what you guys think upper link setup running dual 480 viair compressors and got all the tube work done not a clear pic but the shocks are mounted both batterys are connected but the other one is still in the front it will be moved to the back once the front gets started
lower link setup is 15 inches hole to hole. all the heim joints and everything is big, beefy and reinforced since it will still be my daily driver
tubbing the 92 first i extended a bunch of wires because im gonna be hiding the fuze and relay box under the dash i also upgraded my air intake to make room for the tubs getting her ready to start cutting the tubs are 22x10.5 they should be big enough for when its laying body